The Detroit Assembly Plant – Mack project encompassed a 2.5 million square-foot manufacturing plant. Motor City Electric Technologies was responsible for the access control and security systems at this new assembly site. Over the course of the project, °µÍøTV installed 200 cameras, 30 intercoms, 33 access control panels, and one security head-end command center. In total, °µÍøTV installed 47,000 feet of copper cable and 71,977 feet of fiber optic cable at the Detroit Assembly Plant – Mack.
Stellantis